We provide several forms for underground storage tank (UST) operators and service providers to document compliance. We also accept approved equipment manufacturers’ test forms.
Notification
Monthly
Annual
Triennial
Training
Notification
Use the UST Notification Form: PDF | Word to provide the following information:
- New UST or piping installation (30 days)
- UST closure (30 days)
- Change of owner (30 days)
- Piping replacement (24 hours)
- Other UST facility updates
Monthly
Use this form for walkthrough inspections (this includes annual items):
- Walkthrough Inspection – If this electronic form does not open, download it to your desktop.
- Walkthrough Inspection – Print and fill out by hand
Record monthly rectifier readings from impressed current systems:
Record monthly containment:
Annual
Use this form for release detection equipment testing:
- Release Detection Equipment Test – If this electronic form does not open, download it to your desktop.
- Release Detection Equipment Test – Print and fill out by hand
Use the Line Leak Detector and Line Tightness Test Form for:
- Line Tightness Test (.1 gph)
- Automatic Line Leak Detector Test (3 gph)
- Electronic Line Leak Detector (.2 gph)
Triennial
Record testing or overfill device and containment equipment information:
- Overfill-Containment Test – If this form does not open, download it to your desktop.
- Overfill-Containment Test – Print and fill out by hand
- Cathodic Protection Test Report
Training
See a list of training requirements for Class C operators
Record operator training for an UST location
Change operators at an UST Location